HMEMC designs, builds and installs manual RF shielded doors in single-leaf, double-leaf and sliding configurations. Buyers in UAE and the Gulf use our systems for oil and gas and other applications where shielding performance has to be provable, not promised.
HMEMC manufactures manual rf shielded door systems in Changzhou, Jiangsu, and has been supplying EMC and RF shielding equipment to overseas laboratories for years. For UAE and the Gulf we work as manual RF shielded doors in single-leaf, double-leaf and sliding configurations, covering design, manufacture, shipping, installation and commissioning.
| Item | Details |
|---|---|
| Leaf | 3 mm cold-rolled steel construction, custom sizes |
| Gasketing | single blade / double blade with two, three or four rows of finger stock |
| Operation | manual swing, manual sliding, or hand-wheel compression |
| Clear opening | typical from 0.8 m up to 2.5 m, larger on request |
| Finish | anti-corrosion primer and finish coat, colour to specification |
| Standard example | 2.5 x 3 m high-performance manual door supplied to a UAE customer, 2026 |
oil and gas, aviation, defence, telecom, power generation, logistics hubs. Manual RF Shielded Door systems from HMEMC are typically used for:
ESMA / UAE.S requirements, SASO in Saudi Arabia, and defence programmes following MIL-STD practice.
Gulf projects move on schedule. Buyers value a supplier who can commit to a date and mobilise an installation team on site.
Jebel Ali and Khalifa ports, direct air freight, established project cargo routes. Shipments are packed for ocean or air freight, with drawings, packing lists and installation manuals prepared in English. Our site team travels for assembly, alignment and commissioning, and performance is verified by independent metrology laboratories before handover.
Yes. UAE and the Gulf is an active market for us. Equipment is packed for ocean or air freight and shipped to jebel ali and khalifa ports, direct air freight, established project cargo routes or any port you nominate, with our site team available for installation and commissioning.
Standard components are typically ready in 6 to 10 weeks, and large chambers or shielded rooms are quoted with a project schedule. Installation time on site depends on the size of the room; a shielded room is usually assembled in a few days, while a full chamber takes longer.
Performance is specified per frequency band rather than as a single number, because shielding effectiveness falls as frequency rises. Small components such as vents are rated up to 100 dB at 40 GHz, and complete rooms are specified to the attenuation you need, then verified by third-party metrology laboratories.
We work either directly or through local partners, depending on what suits the project. Either way, engineering questions are answered by our own engineers, and installation can be carried out by our site team or supervised jointly with your contractor.
Tell us the size and the performance target. We will come back with a layout and a price.
Email sales.cn@hmemc.com · Phone +86 519 8665 1804 · https://www.emchome.cn/en