HMEMC designs, builds and installs RF shielded boxes and cabinets for bench-level testing, production lines and field work. Buyers in Indonesia use our systems for electronics assembly and other applications where shielding performance has to be provable, not promised.
HMEMC manufactures rf shielded box systems in Changzhou, Jiangsu, and has been supplying EMC and RF shielding equipment to overseas laboratories for years. For Indonesia we work as RF shielded boxes and cabinets for bench-level testing, production lines and field work, covering design, manufacture, shipping, installation and commissioning.
| Item | Details |
|---|---|
| Types | single and double-layer (double-wall) enclosures |
| Why | low unit cost, easy to move, no site installation, short lead time |
| Usable on receipt | shipped ready for immediate use |
| Interfaces | RF connectors, fibre and filtered feed-throughs, D-sub panels |
| Sizes | bench-top to full-height cabinets, dimensions to order |
| Use case | wireless module tuning, production test, RF measurement, EMC screening |
electronics assembly, telecom, automotive, energy, mining equipment. RF Shielded Box systems from HMEMC are typically used for:
SDPPI (Komdigi) requirements with IEC/CISPR based testing; internal test facilities are growing quickly.
Indonesian projects often combine a shielded room with a pre-compliance chamber in one package, installed on a tight site schedule.
Tanjung Priok port in Jakarta; project cargo and installation crews available. Shipments are packed for ocean or air freight, with drawings, packing lists and installation manuals prepared in English. Our site team travels for assembly, alignment and commissioning, and performance is verified by independent metrology laboratories before handover.
Yes. Indonesia is an active market for us. Equipment is packed for ocean or air freight and shipped to tanjung priok port in jakarta or any port you nominate, with our site team available for installation and commissioning.
Standard components are typically ready in 6 to 10 weeks, and large chambers or shielded rooms are quoted with a project schedule. Installation time on site depends on the size of the room; a shielded room is usually assembled in a few days, while a full chamber takes longer.
Performance is specified per frequency band rather than as a single number, because shielding effectiveness falls as frequency rises. Small components such as vents are rated up to 100 dB at 40 GHz, and complete rooms are specified to the attenuation you need, then verified by third-party metrology laboratories.
We work either directly or through local partners, depending on what suits the project. Either way, engineering questions are answered by our own engineers, and installation can be carried out by our site team or supervised jointly with your contractor.
Tell us the size and the performance target. We will come back with a layout and a price.
Email sales.cn@hmemc.com · Phone +86 519 8665 1804 · https://www.emchome.cn/en